porch floor and walkway East Northport

Published date: July 10, 2023
  • Location: East Northport, New York, United States

Redo the front porch

East Northport

Porch is all wood 4’ x 27’

  1. Remove all wood platform 1x6 board   
  2. Reinforce everything and install plywood on top   
  3. Install cement board on top 
  4. Reface with tile stone on top   
  5. Steps

And 

Walkway work 4 feet by 10 feet 

  1. Remove old paver    
  2. Prepare the site with rca    
  3. Cement all paver borders 
  4. Compact it and put sand
  5. Install pavers  
  6. Put on top polymeric sand

 

Walkway size approx.3 feet by 6 feet

sample 1: 

https://www.youtube.com/shorts/KrEV0YRs4ec

 

real house:

https://www.youtube.com/shorts/mTAgErSW1Ns

 

how they want: 

https://www.youtube.com/shorts/mTAgErSW1Ns

 

 

 


Digital Goods

Download
Download
Download
Download
Download
Download

Contact seller Share

Useful information

  • The project and your price is confidential between company and worker so it means do not talk money with our customers
  • There is no change of work price once is set the price and when the entire project is finished well done the pay is in full
  • When you take a task from the beginning, you must finish until the end. Otherwise, you may not see your pay for abandoned work
  • Very important: to have a record of your work, our company need photos-videos of each day working
  • We always practice good company values: Trust, Confidentiality, Honor, integrity, Teamwork, Honesty, Respect, Punctuality
  • FREE WORK DETAILS FOR Independent Workers

Related listings

  • fix the stone of this retaining wall outside
    fix the stone of this retaining wall outside
    Landscaping Work - Huntington (New York) - June 11, 2023

    it colapsed all the stone down  so it needs to reassemble all the stone:  one small size is like 8 feet by 4 feet  the other longer wall is like 10 feet by 3 1/2    all the stone is in the place   only labor price 

  • level the area, debris removal and top soil on top
    level the area, debris removal and top soil on top
    Landscaping Work - Ronkonkoma (New York) - May 24, 2023

    see the picture and video:  it needs to level the area where it's shown  where is the saw-saw,  that area it's pretty much level but it needs to fix too  and the other area it needs more to fix it   Approximately size area: 4' x 24'  and 4' x 18'  / ...

  • level the area and remove some bushes
    level the area and remove some bushes
    Landscaping Work - Huntington Station (New York) - April 14, 2023

    Front yard: Level and top soil because a cesspool was put in the same area and put some topsoil    Rear and by driveway: Shrubs, bushes to rip out and open up the area, Some weed bushes are badly needs to be removed. Some of them are good, so leave i...