work entire basement - already advanced half way- start tomorrow at 8am Patchogue
Published date: April 2, 2025
Modified date: April 2, 2025
- Location: Patchogue, New York, United States
One basement project: https://www.youtube.com/watch?v=pAR-b3rHYRM
install Vinyl floor on stairs – 3 steps – landing – 8 steps
install vinyl floor entire basement floor – approx. 550 sq/ft
- drywall by the stairs
- basement drywall # install 30 pcs spackle 60
- spackle – primer – paint
framing some areas – 10 studs
install one bathroom – (shower wall tile done) shower base – toilet – sink - floor tile-half wall tile
- backsplash size – up to 30 sq/ft
- install kitchen cabinet # 6 pcs
- sink
- open concrete to install one window for kitchen
Another kitchen - 10 cabinet
backsplash tile 40 square/feet
New sink for kitchen
framing box top ceiling
make one closet with door 2ft by 5ft – another closet door - storage closet under stairs
another bathroom 4x8– sump pump install – wall tile - shower base – sink - toilet
another project:
basement entrance: door, drywell drain - railing
we need a price only labor and pickup materials... all materials homeowner will pay it






Useful information
- Once the price is set we will not change it
- you need to be responsible with your work from start to finish
- we will pay at the end of all work
- Get along with homeowners and do nice work and your money is guaranteed