13 stockwood fence installation

Published date: September 8, 2026
  • Location: Mastic Beach, New York, United States

English

Scope of Work

  1. Remove existing fence sections, posts, and all related materials.
  2. Remove existing concrete from old fence posts as required.
  3. Haul away and properly dispose of all fence debris and construction waste.
  4. Layout and measure the new fence line.
  5. Dig all required post holes.
  6. Install new pressure-treated fence posts set in concrete.
  7. Verify all posts are plumb, properly spaced, and securely set.
  8. Install thirteen (13) new 6' x 8' stockade fence sections (approximately 104 linear feet).
  9. Secure all fence sections to posts and ensure proper alignment.
  10. Verify fence is straight, level, and structurally secure.
  11. Perform final site cleanup and remove all remaining debris from the property.

Español

Alcance del Trabajo

  1. Retirar las secciones de cerca existentes, postes y todos los materiales relacionados.
  2. Remover el concreto existente de los postes antiguos cuando sea necesario.
  3. Cargar, transportar y desechar todos los residuos de la cerca y desperdicios de construcción.
  4. Marcar y medir la línea de la nueva cerca.
  5. Excavar todos los hoyos necesarios para los postes.
  6. Instalar postes nuevos tratados a presión y fijarlos con concreto.
  7. Verificar que todos los postes queden a plomo, correctamente espaciados y firmemente instalados.
  8. Instalar trece (13) secciones nuevas de cerca tipo stockade de 6' x 8' (aproximadamente 104 pies lineales).
  9. Fijar todas las secciones a los postes y asegurar la alineación correcta.
  10. Verificar que la cerca quede recta, nivelada y estructuralmente firme.
  11. Realizar limpieza final y retirar todos los residuos restantes de la propiedad.

WE NEED: 

LABOR PRICE + ALL DEBRIS REMOVAL AND TAKE WITH YOU + PICKUP MATERIALS  

customer will pay for materials 

Final Date for Decision: September 8, 2026