concrete and self leveling work
- Location: Long Island City, New York, United States
1. PATCHING TWO SMALL ROOMS
-
Patch Room #1: 6 ft × 2 ft
-
Patch Room #2: 6 ft × 2 ft
-
Clean damaged area
-
Remove loose concrete and debris
-
Apply bonding agent
-
Mix cement properly
-
Fill the hole and level it
-
Smooth the surface
-
Allow proper curing time
2. SELF‑LEVELING – 1,000 SQ FT
-
Clean entire 1,000 sq ft area
-
Remove dust, bumps, paint chips
-
Apply primer for self‑leveling
-
Mix self‑leveling compound
-
Pour and spread evenly
-
Use gauge rake and smoothing tool
-
Maintain thin coat (not thick)
-
Let cure overnight
3. POLISHING / SANDING – 300 SQ FT
-
Sand the 300 sq ft area
-
Remove rough spots and scratches
-
Vacuum all dust
-
Apply floor polish or wax
-
Buff until shiny
4. GENERAL WORK CONDITIONS
-
Commercial building: follow noise rules
-
Protect walls, doors, and equipment
-
Keep workspace clean
-
Remove all garbage at the end
-
Follow safety procedures
5. MATERIALS INCLUDED
-
Cement mix
-
Self‑leveling compound
-
Primer
-
Bonding agent
-
Sanding pads
-
Polish / wax
-
All tools and equipment
6. WORK SCHEDULE
-
Start immediately
-
Estimated duration: 2–3 days
WE NEED A PRICE INCLUDED MATERIALS AND LABOR