small bathroom 4 feet by 4 feet Jamaica
- Location: Jamaica, New York, United States
Basement Bathroom remodeling
It needs to remove all wall, ceiling, and tile floor
Floor is concrete slab
All tile floor is out and replace with new tile
All walls with drywall/wonderboard behind will be out and ceiling too
New shower body replace
The shower spot install on the ceiling
Install all walls and ceiling with cement board , apply thinset
Remove entrance door - white 6 panel wood door and install new shower door
Install new toilet and sink at the same place
Install new tile same size or bigger on the wall, ceiling, floor.
Grout everything
No painting
—------------------------------------------------------------------------------------------------------
BOILER ROOM:
Folding doors wide is like 8-10 feet long by 6 feet height
Remove that
Frame all the wall and make opening for door installation
Install drywall, spackle and paint the area
Install new 32 inches door
One side drywall on the wall
Inside the boiler no need to have drywall.
---------------------------------------------------
see in bigger pictures:
https://photos.app.goo.gl/ZxJRPnmuqLas7Hkb9
https://docs.google.com/document/d/1CCFE8bhujsV5DIfzPnZiAEHUG0nBHKqKIciE84lkni0/edit?usp=sharing
Digital Goods
Useful information
- The project and your price is confidential between company and worker so it means do not talk money with our customers
- There is no change of work price once is set the price and when the entire project is finished well done the pay is in full
- When you take a task from the beginning, you must finish until the end. Otherwise, you may not see your pay for abandoned work
- Very important: to have a record of your work, our company need photos-videos of each day working
- We always practice good company values: Trust, Confidentiality, Honor, integrity, Teamwork, Honesty, Respect, Punctuality
- FREE WORK DETAILS FOR Independent Workers
Related listings
-
partial bath remodelMiscellaneous Handyman Jobs - Hempstead (New York) - March 6, 2024
Second floor Bathroom partial remodel It has an attic space. No demolition Prepare and install full wall tile, all around - 12” by 24” size tile new exhaust fan with light. And a new hi-light on the top of the shower area. Instal...
-
drywall molding carpet paintMiscellaneous Handyman Jobs - Deer Park (New York) - February 28, 2024
up to 10 drywall spackle/ paint all basement - carpet floor and stair - base molding all around basement. in the basement there are 2 small rooms...one storage, laundry room and another one small living room....first 2 pics from laundry room and othe...
-
to install medicine cabinetMiscellaneous Handyman Jobs - Valley Stream (New York) - February 5, 2024
this amazon medicine cabinet need to install inside the wall frame it to put inside the wall maybe it needs to cut the tile lights all materials its on site https://www.amazon.com/dp/B0C7Q4Q8SG?starsLeft=1&ref_=cm_sw_r_cso_cp_apin_dp_SRWQB48A7SYS...