new second floor on top - all basic material East Meadow

Published date: February 2, 2024
  • Location: East Meadow, New York, United States

remove all the attic

frame all the second floor: apartment of 2 bedroom 

living room, kitchen, hallway, bathroom

new roof - viny siding

windows and doors

basic floor - carpet and laminate floor.

 

price included all materials - dumpster - labor 

per square /foot

 


Digital Goods

Contact seller Share

Useful information

  • The project and your price is confidential between company and worker so it means do not talk money with our customers
  • There is no change of work price once is set the price and when the entire project is finished well done the pay is in full
  • When you take a task from the beginning, you must finish until the end. Otherwise, you may not see your pay for abandoned work
  • Very important: to have a record of your work, our company need photos-videos of each day working
  • We always practice good company values: Trust, Confidentiality, Honor, integrity, Teamwork, Honesty, Respect, Punctuality
  • FREE WORK DETAILS FOR Independent Workers

Related listings

  • POOL BRICKS AROUND - FENCE AND BUSHES
    POOL BRICKS AROUND - FENCE AND BUSHES
    New Construction - Oyster Bay (New York) - May 10, 2023

    Brand new Pool built and now only needs bricks around   Fence Bushes Pool bricks   I also need a patio around my pool if u know how to do it   Here is the deal for the pool area: We have 104 lineal feet of bluestone coping around pool. we have 650 sq...

  • build a deck in above ground pool with simple railing
    build a deck in above ground pool with simple railing
    New Construction - Sayville (New York) - May 6, 2023

    POOL ALREADY THERE IN THE BACKYARD  We have the pool installed. Need a deck built   I want the stairs in the front. Full width. And deck straight. The pool is oval. Not round   SIZE:  10 ft wide 5 foot deep 30" tall   Yes. Has to be up to code. We ar...

  • TO INSTALL NEW PAVER IN BACKYARD
    TO INSTALL NEW PAVER IN BACKYARD
    New Construction - Huntington Station (New York) - April 2, 2023

    prepare the area: to remove the grass on the area of 10 feet by 12 feet  compact the area, rca  cement on the paver borders  sand in the middle , make it level  and install NEW pavers    https://www.youtube.com/shorts/QP0W10fOdzA