Listings
-
new second floor on top - all basic materialNew Construction - East Meadow (New York) - February 2, 2024
remove all the attic frame all the second floor: apartment of 2 bedroom living room, kitchen, hallway, bathroom new roof - viny siding windows and doors basic floor - carpet and laminate floor. price included all materials - dumpster - labor per ...
-
POOL BRICKS AROUND - FENCE AND BUSHESNew Construction - Oyster Bay (New York) - May 10, 2023
Brand new Pool built and now only needs bricks around Fence Bushes Pool bricks I also need a patio around my pool if u know how to do it Here is the deal for the pool area: We have 104 lineal feet of bluestone coping around pool. we have 650 sq...
-
build a deck in above ground pool with simple railingNew Construction - Sayville (New York) - May 6, 2023
POOL ALREADY THERE IN THE BACKYARD We have the pool installed. Need a deck built I want the stairs in the front. Full width. And deck straight. The pool is oval. Not round SIZE: 10 ft wide 5 foot deep 30" tall Yes. Has to be up to code. We ar...
-
TO INSTALL NEW PAVER IN BACKYARDNew Construction - Huntington Station (New York) - April 2, 2023
prepare the area: to remove the grass on the area of 10 feet by 12 feet compact the area, rca cement on the paver borders sand in the middle , make it level and install NEW pavers https://www.youtube.com/shorts/QP0W10fOdzA
- 1