Bathroom 5x8 partial remodeling Bethpage

Published date: March 21, 2023
Modified date: March 22, 2023
  • Location: Bethpage, New York, United States

5 feet by 8feet Bathroom remodel in Bethpage NY

 

  1. Remove all the drywall in the walls and tiles, floor tile and underneath until plywood, in conclusion have a bathroom with no walls and no floor. Only wood studs.
  2. The ceiling drywall stays, exhaust fan stays, maybe some spackle and paint the ceiling
  3. Install new green drywall outside the shower wall and spackle
  4. Install cement board in the shower area wall from the bottom to top, at least up to shower head.
  5. UNDERNEATH THE FLOOR OF THIS BATHROOM, THERE IS THE FIRST FLOOR.
  6.  

Plumbing work:

  • Replace the trap from bathtub to shower and install new plumbing lineal with mud job- new drain
  • Replace from tub faucet to shower body faucet
  • BASIC SHOWER BODY
  • Reinstall toilet and sink
  •  

 

 

  1. Install new shower floor tile and full shower wall tile from the bottom to top all tile and
  2. Outside shower wall, put also knee tile walls 4 feet
  3. Put new cement board or mud job in the bathroom floor
  4. Install floor tile
  5. Grout all tiles
  6. Install new shower door
  7. Spackle – paint
  8. Replace entrance door and lock – all painted
  9. Replace medicine cabinet, maybe inside the wall
  10. Put the lights
  11. Install bathroom accessories like towel hanger, toilet tissue hanger, etc.…
  12. All wall tiles and floor tiles will be the same size tile or bigger but no subway tile.

 

Building materials subcontractor will provide

 

Homeowner will provide some materials:

  • Tile walls and floor tile
  • Faucet
  • Sink
  • Medicine cabinets

 

  • Lights
  • Bathroom accessories
  • toilet

 

 

 


Digital Goods

Download

Contact seller Share

Useful information

  • The project and your price is confidential between company and worker so it means do not talk money with our customers
  • There is no change of work price once is set the price and when the entire project is finished well done the pay is in full
  • When you take a task from the beginning, you must finish until the end. Otherwise, you may not see your pay for abandoned work
  • Very important: to have a record of your work, our company need photos-videos of each day working
  • We always practice good company values: Trust, Confidentiality, Honor, integrity, Teamwork, Honesty, Respect, Punctuality
  • FREE WORK DETAILS FOR Independent Workers

Related listings

  • small bathroom 6 x 6 partial remodel
    small bathroom 6 x 6 partial remodel
    Bathroom Remodeling - Plainview (New York) - August 1, 2023

    Demo shower area     Some spackle and painting wall and ceiling and door     Replace shower body  Floor tile will be on top of the existing tile  Cement board on the 2 shower wall and mud job with new drain in shower floor   Tile on the shower wall  ...

  • full bathroom remodeling and one ceiling patch
    full bathroom remodeling and one ceiling patch
    Bathroom Remodeling - Deer Park (New York) - July 25, 2023

    Bathroom renovation 5 feet by 8 feet  Now it's bathtub and convert to plastic shower base  Replace the shower  Repair kitchen ceiling half  DRYWALL and primer/paint the area  —--------------------------------------------------------- Demolition   Ins...

  • full replacement as it is BATHROOM remodeling
    full replacement as it is BATHROOM remodeling
    Bathroom Remodeling - Wantagh (New York) - July 19, 2023

    First floor bathroom  House has unfinished basement underneath - everything is open the basement ceiling 5x9 bathroom    EVERYTHING WILL BE REPLACEMENT.    Complete removal of wall, ceiling, floor, everything out to the dumpster  Install new bathtub ...